|
|
|
| |
 |
Here the SCARA robot has picked up the two components for the assembly and presents them to the staking fixture for permanent assembly. |
|
Date: 23 September 2009 Category: Shipman Technologies |
|
|
|
|
|
|
|
|
|
|
| |
 |
This video highlights the ability of our SCARA robots to step through a pallet of parts, simplifying handling and increasing throughput. The pallets were designed and built in-house at Shipman Tech. In the background, the robot can be seen dropping the finished components in a bin and returning to pick up the next part from the bowl feeder. [More] [Less] |
|
Date: 23 September 2009 Category: Shipman Technologies |
|
|
|
|
|
|
|
|
|
|
| |
 |
Here the SCARA robot picks one of the raw components up from the bowl feeder and indexes to a pallet containing a second component. The bowl feeders, pallets, and end effectors are all designed and built in-house. |
|
Date: 23 September 2009 Category: Shipman Technologies |
|
|
|
|
|
|
|
|
|
|
| |
 |
Robotic assembly of medical check valve being performed by SCARA robots at Shipman Tech. Millions of check valves shipped - ZERO DEFECTS! |
|
Date: 23 September 2009 Category: Shipman Technologies |
|
|
|
|
|
|
|